Case study 05 — Scania Quality Gate
Fewer lost minutes on the factory floor
Reducing time lost for the Quality Gate team on Scania’s truck manufacturing floor in Oskarshamn, by grounding the work in thorough UX research.

Starting with people
Following Design Thinking, the work began by empathising with the team: contextual inquiries, interviews and surveys, triangulated into one picture of their day.
From insight to wireframe
The qualitative data became affinity diagrams, then personas, then lo-fi wireframes the team could react to. The pattern was clear: time went on looking things up and writing things down twice, not on the checks themselves.
Built on SDDS
Sketches became high-fidelity designs ready for development, built on the Scania Digital Design System (SDDS) for consistency across Scania’s products.